
Photometric Design Services
Permit-Ready
Photometric Plans.
Manufacturer-agnostic · 48-hour delivery · All 50 states
or call(713) 208-7364Any Fixture
Manufacturer-Agnostic
99%
Approval Rate
48 hrs
Turnaround
50
States Served
What We Do
Photometric design engineered for code compliance.
Every plan we deliver is modeled in AGi32 to your jurisdiction's specific lighting code — IES illumination standards, municipal setback requirements, uniformity ratios, dark sky compliance. Point-by-point calculations at the grid spacing your plan reviewer expects to see.
No fixture sales. No product lock-in. One deliverable: the permit-ready photometric plan your project needs to move forward.

What You Receive
Four deliverables. One permit-ready package.

Iso-Footcandle Contour Analysis
Sample — Blue Springs, MO
Beyond the Photometric Plan
Your permit needs more than a photometric plan.
Most commercial lighting permits require additional documentation alongside the photometric calculations — electrical load analysis, energy code compliance, voltage drop verification. We produce the complete lighting documentation package so your submittal is complete the first time.
Load Calculations
NEC Article 220 electrical load analysis — total connected lighting load, demand factors, panel capacity and conductor sizing verification.
Energy Code Compliance
COMcheck certificates per IECC and ASHRAE 90.1 documenting that connected lighting loads meet the jurisdiction’s watts-per-square-foot budget.
Voltage Drop Verification
Conductor sizing calculations confirming branch circuit and feeder runs stay within NEC-recommended limits from panel to farthest fixture.
Permit Coordination
Application assistance and direct communication with plan reviewers to resolve comments and keep the permit moving through approval.
HOW IT WORKS
Three steps. 48 hours.
Send your site plan
CAD, PDF, or a photo from your phone. We work with whatever format you have.
We engineer your plan
We model the site, calculate illumination, and document compliance for your jurisdiction.
Download and submit
Your permit-ready package arrives in as little as 48 hours. Submit directly to the city.
Who We Serve
Built for every stakeholder in the permitting process.
Not sure what a photometric plan is? Here's what you need to know
INDUSTRIES
Photometric plans for every application.
Start My PlanDon't see your project type? We handle any commercial outdoor lighting application. Tell us about your project →
Start your project
Ready to Get Started?
Tell us about your project and receive a permit-ready plan in as little as 48 hours.







